BIOMASS POWER PLANT WITH INSTALLED CAPACITY OF 5 000 KW

 From 2016, SOYUZ Corporation successfully implements the project "Construction of biomass power plant with installed capacity of 5000 kW in Pereyaslav-Khmelnytskyy town, Kyiv region" as one of the most advanced using of biofuels in Ukraine as an alternative, renewable energy source and which provides the state strategy of Ukraine for achieving energy independence. An increase in the construction of biomass energy companies will allow Ukraine not to remain anxiously dependent on imports of fossil fuels.

To date, the following works have been completed and are ongoing:

- installation of a steam boiler of 18 MW capacity with a utilization factor of more than 90 per cent, which will work on biofuel – chipped wood. The boiler equipment consists of a Wartsila Boiler, manufactured on a Biograte wood grate and equipped with a super-heater and water economizer; draught system, which includes a forced-flow fan, an induced-draft fan and an induced-draft fan for flue gas recirculation, manufactured by HALIFAX FAN Inc.; KSB charging pumps;

- installation of the turbine equipment consisting of a turbine-generator set including FR13M2-15 TRIVENI turbine with a torque converter and an AvK synchronous generator, type DIG150m/4, manufactured by AvK Deutschland Gmbh & Co.KG; condenser, oil cooling system and closed cooling system, which include plate recirculating airflow enclosures with fans and KSB circulating and condensate pumps;

- installation of a fuel preparation and fuel supply system, which provides for possibility of working with chipped wood, both of its own production and imported, which includes a flaker structure, a chipped wood receiving unit, fuel stores and conveyors;

- performance tuning:

  • debugging of software for PLC and LMI;
  • adjustment of channels of measurement and control;
  • adjustment of electricity distribution systems;
  • tests and commissioning.

 

 All equipment that will operate at the newly built power plant is purchased in the UK and in relation to emissions into the air; it meets the strict Euro-5 standards (the highest current standard of safety in Ukraine for carbon dioxide emissions into the atmosphere).

The work is scheduled to be completed in 2018.

 

 

The installation of the main technological equipment and electrical equipment of the plant was completed

 

 

 The completed work on the installation of electrical equipment

 

 

  Installation of measuring-and-recording apparatus and control devices is underway

 

  The production of elements of temporary pipelines for water-chemical washing is underway

 

 The automation system is being adjusted