Corporate Logo
Back to projects
110 KV OHL OF THE “SONIACHNA – ARTSYZ” SOLAR POWER PLANT, 110 KV “SONIACHNA – ARTSYZ” SUBSTATION

110 KV OHL OF THE “SONIACHNA – ARTSYZ” SOLAR POWER PLANT, 110 KV “SONIACHNA – ARTSYZ” SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Construction, installation and commissioning of the 110 kV Soniachna–Artsyz grid connection substation
Industry:
Alternative energy
Location:
Odesa region, Ukraine
Project timeline:
2011-2012

Project description

As part of the national “Energy of Nature” project, Soyuz Corporation completed construction, installation and commissioning of the 110 kV Soniachna–Artsyz grid connection substation in Odesa region. The client was the state enterprise National Power Company “Ukrenergo”. The facility was built under the State Targeted Economic Energy Efficiency Programme 2010–2016 to increase the capacity of solar power plants.

Gallery

110 KV OHL OF THE “SONIACHNA – ARTSYZ” SOLAR POWER PLANT, 110 KV “SONIACHNA – ARTSYZ” SUBSTATION 110 KV OHL OF THE “SONIACHNA – ARTSYZ” SOLAR POWER PLANT, 110 KV “SONIACHNA – ARTSYZ” SUBSTATION 110 KV OHL OF THE “SONIACHNA – ARTSYZ” SOLAR POWER PLANT, 110 KV “SONIACHNA – ARTSYZ” SUBSTATION