110 KV OHL OF THE “SONIACHNA – ARTSYZ” SOLAR POWER PLANT, 110 KV “SONIACHNA – ARTSYZ” SUBSTATION
- Client:
- SE NPC “Ukrenergo”
- Scope of work:
- Construction, installation and commissioning of the 110 kV Soniachna–Artsyz grid connection substation
- Industry:
- Alternative energy
- Location:
- Odesa region, Ukraine
- Project timeline:
- 2011-2012
Project description
As part of the national “Energy of Nature” project, Soyuz Corporation completed construction, installation and commissioning of the 110 kV Soniachna–Artsyz grid connection substation in Odesa region. The client was the state enterprise National Power Company “Ukrenergo”. The facility was built under the State Targeted Economic Energy Efficiency Programme 2010–2016 to increase the capacity of solar power plants.