110 KV OHL OF THE “SONIACHNA – KILIIA” SOLAR POWER PLANT, 110 KV “SONIACHNA – KILIIA” SUBSTATION
- Client:
- SE NPC “Ukrenergo”
- Scope of work:
- Construction, installation and commissioning of the 110 kV Soniachna–Kiliia OHL and grid connection substation
- Industry:
- Alternative energy
- Location:
- Odesa region, Ukraine
- Project timeline:
- 2011-2014
Project description
As part of the national “Energy of Nature” project, Soyuz Corporation completed construction, installation and commissioning of the 110 kV Soniachna–Kiliia grid connection substation in Odesa region. The company installed two 40 MVA TRDN-40000/110-U1 power transformers, assembled the 110 kV outdoor switchgear and built the indoor switchgear building and control room. A 9.5 km double-circuit 110 kV overhead line was also built from the substation to the 110 kV Kiliia substation. The substation serves a solar power plant: electricity generated by the plant is stepped up to 110 kV and transmitted to the grid at the 110 kV Kiliia substation. The “Energy of Nature” project, launched in Ukraine in 2011, will generate 5 billion kWh of clean electricity a year for 25 years and was expected to raise the share of renewables in national generation from 0.04% to 3% by 2014. The solar plant created new jobs in the region, contributed to the local budget and made the area fully independent of electricity supplies from neighbouring Moldova.
Gallery