RECONSTRUCTION OF THE 330 KV KRYVYI RIH TPP – TRYHATY OHL
- Client:
- SE NPC “Ukrenergo”
- Scope of work:
- Reconstruction of spans No. 74–150 and 160–172 with replacement of reinforced concrete towers by steel towers
- Industry:
- Power engineering
- Location:
- Dnipropetrovsk and Mykolaiv regions, Ukraine
- Project timeline:
- 2012-2012
Project description
Commissioned by the state enterprise National Power Company “Ukrenergo”, Soyuz Corporation reconstructed the 330 kV Kryvyi Rih TPP – Tryhaty overhead line, replacing reinforced concrete towers and the overhead earth wire. The reconstructed section is more than 15 km long.
Gallery