RECONSTRUCTION OF THE TGV-200 TURBINE GENERATOR AT POWER UNIT NO. 5, DTEK BURSHTYN TPP
- Client:
- PJSC “DTEK Zakhidenergo”
- Scope of work:
- Reconstruction of the generator and its thyristor excitation system at power unit No. 5, DTEK Burshtyn TPP
- Industry:
- Thermal power
- Location:
- Ivano-Frankivsk region, Ukraine
- Project timeline:
- 2013-2015
Project description
Commissioned by PJSC “Zakhidenergo”, Soyuz Corporation reconstructed the generator and its thyristor excitation system at power unit No. 5 of DTEK Burshtyn TPP. Within the contractual deadline the following works were completed. TGV-200 reconstruction, to increase generator output: ✓ complete replacement of the stator windings and restoration of the core properties at the TPP turbine hall; ✓ rotor reconstruction at the manufacturer’s plant; ✓ design for replacing hydrogen cooling of the stator windings with water cooling and for replacing the excitation system. UNITROL 6800 excitation system: ✓ installation of the excitation system; ✓ reconstruction of the standby exciter selection unit with replacement of DC disconnectors and the protection cabinet; ✓ installation of the excitation transformer protection system and the interface with the unit control room. At the plant’s request, the excitation system was also made capable of operating in asynchronous mode. Burshtyn TPP has since been heavily damaged by russian shelling.
Gallery