RECONSTRUCTION OF ELECTRICAL EQUIPMENT OF POWER UNIT NO. 5, DTEK BURSHTYN TPP
- Client:
- PJSC “DTEK Zakhidenergo”
- Scope of work:
- Reconstruction of electrical equipment of power unit No. 5, DTEK Burshtyn TPP
- Industry:
- Thermal power
- Location:
- Ivano-Frankivsk region, Ukraine
- Project timeline:
- 2013-2015
Project description
Commissioned by PJSC “Zakhidenergo”, Soyuz Corporation reconstructed the electrical equipment of power unit No. 5 of DTEK Burshtyn TPP within ten months. The works included: ✓ repair of the synchronous motors of the ball mills and replacement of their electromechanical excitation with VTE320/150 static thyristor exciters; ✓ replacement of high- and low-voltage motors of the main and auxiliary process equipment; ✓ reconstruction of the unit’s cabling and lighting; ✓ reconstruction of the 6 kV switchgear, replacing oil circuit breakers with VR-2 vacuum breakers, together with relay protection and automation; ✓ microprocessor protection of the generator–transformer unit, ALTRA-32 earth-fault protection and the REGINA fault recorder; ✓ overhaul of the TRDN 25000/35A auxiliary transformer; ✓ reconstruction of the 220 kV outdoor switchgear, replacing RLND-220 disconnectors with SGF245 and TFND-220 current transformers with IMB 245; ✓ reconstruction of the TGV-200 stator and rotor with conversion to water-cooled stator windings and a new UNITROL 6800 thyristor excitation system with its transformer. Following the motor replacement and cable reconstruction, individual and integrated equipment tests were carried out. Burshtyn TPP has since been heavily damaged by russian shelling.
Gallery