RECONSTRUCTION OF THE 330 KV USATOVE SUBSTATION

RECONSTRUCTION OF THE 330 KV USATOVE SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Construction, installation and commissioning works and equipment supply at the 330 kV Usatove substation
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2011-2012

Project description

In December 2012 SE NPC “Ukrenergo” put the reconstructed 330 kV Usatove substation of the Southern Power System into operation, with a new 200 MVA transformer (5AT). The facility was built under the development plan of the Integrated Power System of Ukraine for 2010 with an outlook to 2015 to ensure a reliable power supply to Odesa and Odesa region. The works were carried out by Soyuz Corporation.