RECONSTRUCTION OF POWER UNIT NO. 7 OF BURSHTYN TPP
- Client:
- OJSC “Zakhidenergo”
- Scope of work:
- Reconstruction and technical re-equipment of power unit No. 7
- Industry:
- Thermal power
- Location:
- Ivano-Frankivsk region, Ukraine
- Project timeline:
- 2011-2011
Project description
Commissioned by OJSC “Zakhidenergo”, Soyuz Corporation, together with ALSTOM, delivered Ukraine’s first pilot project “Reconstruction and technical re-equipment of power unit No. 7 of Burshtyn TPP”, including: reconstruction of the low-pressure cylinder of the turbine unit; reconstruction of the turbine’s hydraulic control system; reconstruction of the turbine oil system. As a result, in particular thanks to the reconstruction of the low-pressure cylinder, the turbine unit achieved: an increase in electrical output of 12.5 MW above the rated 200 MW; an internal efficiency of the low-pressure cylinder flow path of 89%; a reduction in gross specific heat consumption of 120 kcal/kWh compared with tests carried out before the reconstruction. Burshtyn TPP has since been heavily damaged by russian shelling.
Gallery