Corporate Logo
Back to projects
REPLACEMENT OF CIRCUIT BREAKERS AT THE 330 KV TRYHATY SUBSTATION

REPLACEMENT OF CIRCUIT BREAKERS AT THE 330 KV TRYHATY SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Replacement of four 330 kV air-blast circuit breakers with SF6 circuit breakers
Industry:
Power engineering
Location:
Mykolaiv region, Ukraine
Project timeline:
2010-2011

Project description

Soyuz Corporation replaced the VVN-330 and VV-330B air-blast circuit breakers at the 330 kV Tryhaty substation with SIEMENS 420 kV SF6 circuit breakers, covering design, construction, installation, commissioning and site supervision, equipment supply and staff training. The work was carried out at an operating substation.