RECONSTRUCTION OF SECTIONS 1–3 OF THE 110 KV SWITCHGEAR AT THE 330 KV USATOVE SUBSTATION
- Client:
- SE NPC “Ukrenergo”
- Scope of work:
- Reconstruction of the 330 kV Usatove substation including sections 1–3 of the 110 kV outdoor switchgear
- Industry:
- Power engineering
- Location:
- Odesa region, Ukraine
- Project timeline:
- 2011-2011
Project description
Soyuz Corporation carried out construction and installation works for the reconstruction of the 330 kV Usatove substation, including sections 1–3 of the 110 kV outdoor switchgear, commissioned by Pivdenna Energy Company LLC. All works were performed on the energised 110 kV switchgear in a zone of induced voltage. Soyuz Corporation specialists delivered the facility on time and to a high standard.