RECONSTRUCTION OF POWER UNIT NO. 7 OF BURSHTYN TPP

RECONSTRUCTION OF POWER UNIT NO. 7 OF BURSHTYN TPP

Client:
OJSC “Zakhidenergo”
Scope of work:
Reconstruction and technical re-equipment of power unit No. 7
Industry:
Thermal power
Location:
Ivano-Frankivsk region, Ukraine
Project timeline:
2011-2011

Project description

Commissioned by OJSC “Zakhidenergo”, Soyuz Corporation, together with ALSTOM, delivered Ukraine’s first pilot project “Reconstruction and technical re-equipment of power unit No. 7 of Burshtyn TPP”, including: reconstruction of the low-pressure cylinder of the turbine unit; reconstruction of the turbine’s hydraulic control system; reconstruction of the turbine oil system. As a result, in particular thanks to the reconstruction of the low-pressure cylinder, the turbine unit achieved: an increase in electrical output of 12.5 MW above the rated 200 MW; an internal efficiency of the low-pressure cylinder flow path of 89%; a reduction in gross specific heat consumption of 120 kcal/kWh compared with tests carried out before the reconstruction. Burshtyn TPP has since been heavily damaged by russian shelling.

Gallery

RECONSTRUCTION OF POWER UNIT NO. 7 OF BURSHTYN TPP