FULL REPAIR OF THE BOILER At SE "SEVERODONETSK CHPP"

Client:
State Enterprise "Severodonetsk CHPP"
Subject:
Full repair of boiler TGM-84B, st. No.19
Branch:
Heat power engineering
Location:
Severodonetsk, Lugansk region, Ukraine; the territory of SE “Severodonetsk CHPP”
Terms:
2018

ABOUT PROJECT

FULL REPAIR OF THE BOILER At SE "SEVERODONETSK CHPP"

Customized by State Enterprise "Severodonetsk CHPP", Severodonetsk , Lugansk region, in order to restore the fleet life of elements of boiler TGM-84B TKZ, st. No.19, of SE "Severodonetsk CHPP" Corporation "Soyuz" has begun in 2018 work on full repair of the boiler in the volume (according to the defective act) of:

   replacement of the boiler screen system;

   100 % replacement of serpentines of water economizer;

   replacement of pipelines of steam and high pressure water; replacement of the shut-off valve of the boiler;

   repair of RAH with 100 % replacement of the heating fettling of the  "hot" and cold layer;

   work on restoration of gas boiler passes;

    work on envelope and thermal insulation;

   work on cleaning of bends and pipelines under SPL.


 