Reconstruction of "GPP Nova Kakhovka-Dudchyno" AL 150 kV

Client:
«Khersonoblenergo» Public Joint Stock Company
Subject:
Reconstruction of "GPP Nova Kakhovka — Dudchyno" AL 150 kV
Branch:
Electric energy
Location:
Ukraine
Terms:
2016 - 2019

ABOUT PROJECT

Reconstruction of "GPP Nova Kakhovka-Dudchyno" AL 150 kV

PJSC “Power Supply Company “KHERSONOBLENERGO” ordered from SOYUZ Corporation dismantling of the existing OHL 150 kV “Nova Kakhovka MSDS – Dudchyne” (totally 170 towers) and construction of the new overhead line with the installation of new towers of the anchor angle type, single-circuit and two-circuit intermediate towers. Replacement of the following is provided: wire, ground-wire, insulation and overhead line hardware.

Rehabilitation of this overhead line is carried out to remove it out of the borders of Tsukury settlement in Kakhovka district and increasing reliability of the power line operation.

Taking into account that the overhead line in summer provides working of pumping stations, which are extremely necessary for irrigation of agricultural areas, the works were executed in difficult winter conditions.

The works are carried out in the full volume and at a proper level.