RECONSTRUCTION OF THE 750 KV KHMELNYTSKYI NPP – RZESZÓW OVERHEAD LINE WITH CONVERSION TO 400 KV, RECONSTRUCTION OF THE 750 KV SWITCHGEAR AT KHMELNYTSKYI NPP AND INSTALLATION OF A 750/400 KV AUTOTRANSFORMER

Client:
NPC “Ukrenergo”
Scope of work:
Reconstruction of the 750 kV Khmelnytskyi NPP – Rzeszów overhead line
Industry:
Power engineering
Location:
Khmelnytskyi region, Ukraine
Project timeline:
2022-2023

Project description

In 2022 Soyuz Corporation signed a contract with NPC “Ukrenergo” for the reconstruction of the 750 kV Khmelnytskyi NPP – Rzeszów overhead line with its conversion to 400 kV, reconstruction of the 750 kV switchgear at Khmelnytskyi NPP and installation of a 750/400 kV autotransformer. The works were carried out together with the Polish transmission system operator PSE so that electricity generated by the Ukrainian power system could be exported to the European Union. The modernised Khmelnytskyi NPP – Rzeszów line, a powerful interstate line between Poland and Ukraine, successfully passed three-day testing on 27 April 2023. Its launch increases Ukraine’s electricity export potential by 25–30%. The line operates in synchronous mode, so it is available to all participants of the Ukrainian and European markets.