CONSTRUCTION OF SEWAGE PUMPING STATIONS 7A AND 6B IN ODESA

CONSTRUCTION OF SEWAGE PUMPING STATIONS 7A AND 6B IN ODESA

Client:
Odesa Development Programmes Agency, municipal enterprise of Odesa City Council
Scope of work:
Design, construction, installation and commissioning of new pumping stations and equipment supply
Industry:
Municipal utilities
Location:
Odesa, Ukraine
Project timeline:
2015-2015

Project description

As part of the project to reconstruct the main sewerage system of Odesa’s southern catchment, financed by the World Bank “Urban Infrastructure Development 1” loan to Ukraine, Soyuz Corporation, as leader of an international consortium, built two new, modern, highly efficient and fully automated sewage pumping stations — SPS-7A and SPS-6B. Their maximum design capacity is 10,000 m³ per hour (SPS-7A) and 15,000 m³ per hour (SPS-6B). Because of the local terrain and the depth of the main sewers, the underground part of SPS-6B was built as a 14 m deep diaphragm wall and that of SPS-7A as a 23 m deep one. Together with a 1.6 km deep gravity sewer and a pressure main more than 3 km long, the stations form the main sewer of Odesa’s southern catchment, collecting and pumping wastewater from the city centre and the south of the city to the Southern treatment plant. The new main sewer solved a long-standing environmental problem of storm water being discharged into the Black Sea near Arkadia: the old pumping stations could not cope with heavy rainfall, and water overflowed into the sea along the beaches. Stations 6B and 7A fully replaced old low-capacity pumping stations built more than 40 years ago.

Gallery

CONSTRUCTION OF SEWAGE PUMPING STATIONS 7A AND 6B IN ODESA CONSTRUCTION OF SEWAGE PUMPING STATIONS 7A AND 6B IN ODESA