RECONSTRUCTION OF THE 330 KV ADZHALYK – USATOVE OHL
- Client:
- SE NPC “Ukrenergo”
- Scope of work:
- Reconstruction of the double-circuit section of the 330 kV Adzhalyk 2 – Usatove / Moldavska TPP – Usatove OHL
- Industry:
- Power engineering
- Location:
- Odesa region, Ukraine
- Project timeline:
- 2011-2013
Project description
Commissioned by the state enterprise National Power Company “Ukrenergo”, Soyuz Corporation developed the land management and working designs, carried out construction, installation and commissioning, and supplied equipment for the reconstruction of the double-circuit section of the 330 kV Adzhalyk 2 – Usatove – Moldavska TPP – Usatove overhead line. The works were carried out in difficult conditions outside the villages of Nerubaiske and Usatove. The line is 12 km long. Connecting the new line significantly improved the reliability of the Odesa power hub and southern Ukraine.