RECONSTRUCTION OF THE 330 KV MOLDAVSKA TPP – KOTOVSKA OHL
- Client:
- SE NPC “Ukrenergo”
- Scope of work:
- Reduction of the anchor span between towers No. 382 and 435
- Industry:
- Power engineering
- Location:
- Odesa region, Ukraine
- Project timeline:
- 2012-2012
Project description
In 2010 the state enterprise National Power Company “Ukrenergo” and Soyuz Corporation signed a contract for the overhaul of the 330 kV Moldavska TPP – Kotovska overhead line. Under the contract Soyuz Corporation replaced P-330-2 reinforced concrete towers with PB-330-7n reinforced concrete towers and replaced the TK-11 overhead earth wire between towers No. 382 and 440. The work was completed on time and to a high standard.
Gallery