Corporate Logo
Back to projects
RECONSTRUCTION OF THE 220/35/10 KV “BEREZAN” SUBSTATION

RECONSTRUCTION OF THE 220/35/10 KV “BEREZAN” SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Reconstruction of the 220/35/10 kV substation
Industry:
Power engineering
Location:
Mykolaiv region, Ukraine
Project timeline:
2017-2018

Project description

In 2017–2018 Soyuz Corporation, commissioned by SE NPC “Ukrenergo”, reconstructed the 220/35/10 kV Berezan substation in Berezan, Mykolaiv region. The general contractor was Elmiko LLC. The project included construction of the 220 kV and 35 kV outdoor switchgears, the 10 kV indoor switchgear, the control building, fire-fighting tanks, an oil collection tank, outer and inner fencing and on-site roads; replacement of the 220 kV and 35 kV switchgear gantries and busbar gantries; equipment replacement and installation of the indoor switchgear. All work was completed on time and to a high standard. The reconstruction connected the solar power plants of Skhid Solar LLC to the 10 and 35 kV busbars and installed transformer 1T to deliver full output to the 220 kV network.

Gallery

RECONSTRUCTION OF THE 220/35/10 KV “BEREZAN” SUBSTATION RECONSTRUCTION OF THE 220/35/10 KV “BEREZAN” SUBSTATION