RECONSTRUCTION OF THE 220 KV TSENTROLIT SUBSTATION

RECONSTRUCTION OF THE 220 KV TSENTROLIT SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Replacement of two VMT-110 oil circuit breakers on the “Bilshovyk” and “Luzanivka” bays with SF6 breakers and replacement of TS-110 current transformers at the 220 kV Tsentrolit substation
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2012-2012

Project description

Commissioned by the state enterprise National Power Company “Ukrenergo”, Soyuz Corporation replaced two 110 kV VMT-110 oil circuit breakers on the “Bilshovyk” and “Luzanivka” bays with SF6 circuit breakers and replaced the TS-110 current transformers at the 220 kV Tsentrolit substation (Southern Power System), including construction, installation, commissioning, site supervision and equipment supply. The works were carried out in an operating installation under induced voltage.