DESIGN FOR THE RECONSTRUCTION OF THE 110 KV OUTDOOR SWITCHGEAR AT THE 330 KV “USATOVE” SUBSTATION

DESIGN FOR THE RECONSTRUCTION OF THE 110 KV OUTDOOR SWITCHGEAR AT THE 330 KV “USATOVE” SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Working design for the reconstruction of the 110 kV outdoor switchgear at the 330 kV Usatove substation to connect the 110 kV Marazliivska substation
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2013-2013

Project description

Commissioned by the Southern Power System, a division of SE NPC “Ukrenergo”, Soyuz Corporation developed the working design “Reconstruction of the 110 kV outdoor switchgear at the 330 kV Usatove substation to connect the 110 kV Marazliivska substation” in line with the design brief. The work was completed within the contractual deadline.