RECONSTRUCTION OF SSs 330 kV «SHEPETIVKA» AND «KAMYANETS-PODILSKA»

Client:
PJSC «NPC "UKRENERGO»
Subject:
Reconstruction of SSs 330 kV «Shepetivka» and «Kamyanets-Podilska»
Branch:
Power engineering
Location:
Ukraine
Terms:
2020 - 2022

ABOUT PROJECT

RECONSTRUCTION OF SSs 330 kV «SHEPETIVKA» AND «KAMYANETS-PODILSKA»

In 2020, Corporation “SOYUZ”, fulfilling the order of PJSC “NPC “UKRENERGO”, started reconstruction of SSs 330 kV «Shepetivka» and «Kamyanets-Podilska».

The projects of technical re-equipment of the substations 330, 110 kV equipment (measuring transformers with 330, 110 kV oil insulation, 330 kV traps and capacitors, 330, 110 kV arresters) and engineering networks shall be replaced.

Currently, the working documentation has been developed and agreed with the customer, the supply of basic electrical equipment has been completed.

At 330 kV SS "Kamyanets-Podilska" the replacement of lighting masts has started, at 330 kV SS "Shepetivka" the replacement of RVMG 330 kV AT 1 arresters has been performed.

Reconstruction of 330 kV Shepetivka and Kamyanets-Podilska substations is carried out to improve the quality and reliability of energy supply in the region.

Completion of the reconstruction is scheduled for the end of 2021.