Reconstruction, the SS 330 kV "Usatove"

Client:
SE NPC Ukrenergo
Subject:
Execution of construction, installation and pre-commissioning works with the supply of equipment for the projects "Reconstruction of SS 330 kV "Usatove" with the installation of the 3rd 200 MVA autotransformer (5 AT)" and "Reconstruction of SS 330 kV.
Branch:
Power industry
Location:
Ukraine
Terms:
2011-2012

ABOUT PROJECT

Reconstruction, the SS 330 kV "Usatove"

 In December 2012 the SE "NPC "Ukrenergo" put into operation, after reconstruction, the SS 330 kV "Usatove" of the Southern Power System with the installation of 200 MVA autotransformer (5 AT) (Declaration of the facility operational readiness was registered by Inspectorate of GASK in Odessa region on 12.19.2012).

Construction of the facility was stipulated by the development scheme of the United Power System (UPS) of Ukraine for 2010, with the outlook for 2015, to provide the reliability of power supply for Odessa and Odessa region.