RECONSTRUCTION OF THE 750 KV KHMELNYTSKYI NPP – RZESZÓW OVERHEAD LINE WITH CONVERSION TO 400 KV, RECONSTRUCTION OF THE 750 KV SWITCHGEAR AT KHMELNYTSKYI NPP AND INSTALLATION OF A 750/400 KV AUTOTRANSFORMER

Client:
NPC “Ukrenergo”
Scope of work:
Reconstruction of the 750 kV Khmelnytskyi NPP – Rzeszów overhead line
Industry:
Power engineering
Location:
Khmelnytskyi region, Ukraine
Project timeline:
2022-2023
CONSTRUCTION OF THE “INHULETS” SOLAR POWER PLANT

CONSTRUCTION OF THE “INHULETS” SOLAR POWER PLANT

Client:
Inhulets Energo-2 LLC
Scope of work:
Construction of a solar photovoltaic power plant
Industry:
Alternative energy
Location:
Mykolaiv region, Ukraine
Project timeline:
2018-2019
TECHNICAL RE-EQUIPMENT OF THE 330 KV “NOVOKYIVSKA” SUBSTATION

TECHNICAL RE-EQUIPMENT OF THE 330 KV “NOVOKYIVSKA” SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Technical re-equipment of the 330 kV Novokyivska substation: design, manufacture, supply, installation, testing, adjustment and commissioning under the works contract
Industry:
Power engineering
Location:
Kyiv region, Ukraine
Project timeline:
2017-2021
RECONSTRUCTION OF THE 110 KV “ADZHALYK – BEREHOVA 1, 2” OHL

RECONSTRUCTION OF THE 110 KV “ADZHALYK – BEREHOVA 1, 2” OHL

Client:
SE “Pivdennyi Sea Trade Port”
Scope of work:
Reconstruction of the 110 kV Adzhalyk – Berehova 1, 2 OHL
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2018-2018
CONSTRUCTION OF THE 750 KV “RIVNE NPP – KYIVSKA SUBSTATION” OHL

CONSTRUCTION OF THE 750 KV “RIVNE NPP – KYIVSKA SUBSTATION” OHL

Client:
SE NPC “Ukrenergo”
Scope of work:
Construction of the 750 kV Rivne NPP – Kyivska substation OHL
Industry:
Power engineering
Location:
Rivne region, Ukraine
Project timeline:
2013-2015
CONSTRUCTION OF SEWAGE PUMPING STATIONS 7A AND 6B IN ODESA

CONSTRUCTION OF SEWAGE PUMPING STATIONS 7A AND 6B IN ODESA

Client:
Odesa Development Programmes Agency, municipal enterprise of Odesa City Council
Scope of work:
Design, construction, installation and commissioning of new pumping stations and equipment supply
Industry:
Municipal utilities
Location:
Odesa, Ukraine
Project timeline:
2015-2015
DESIGN FOR THE RECONSTRUCTION OF THE 110 KV OUTDOOR SWITCHGEAR AT THE 330 KV “USATOVE” SUBSTATION

DESIGN FOR THE RECONSTRUCTION OF THE 110 KV OUTDOOR SWITCHGEAR AT THE 330 KV “USATOVE” SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Working design for the reconstruction of the 110 kV outdoor switchgear at the 330 kV Usatove substation to connect the 110 kV Marazliivska substation
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2013-2013
RECONSTRUCTION OF THE 110 KV OUTDOOR SWITCHGEAR AT THE 330 KV “USATOVE” SUBSTATION

RECONSTRUCTION OF THE 110 KV OUTDOOR SWITCHGEAR AT THE 330 KV “USATOVE” SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Reconstruction of the 110 kV outdoor switchgear at the 330 kV Usatove substation to connect the 110 kV Marazliivska substation
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2014-2016
RECONSTRUCTION OF THE TGV-200 TURBINE GENERATOR AT POWER UNIT NO. 5, DTEK BURSHTYN TPP

RECONSTRUCTION OF THE TGV-200 TURBINE GENERATOR AT POWER UNIT NO. 5, DTEK BURSHTYN TPP

Client:
PJSC “DTEK Zakhidenergo”
Scope of work:
Reconstruction of the generator and its thyristor excitation system at power unit No. 5, DTEK Burshtyn TPP
Industry:
Thermal power
Location:
Ivano-Frankivsk region, Ukraine
Project timeline:
2013-2015
RECONSTRUCTION OF ELECTRICAL EQUIPMENT OF POWER UNIT NO. 5, DTEK BURSHTYN TPP

RECONSTRUCTION OF ELECTRICAL EQUIPMENT OF POWER UNIT NO. 5, DTEK BURSHTYN TPP

Client:
PJSC “DTEK Zakhidenergo”
Scope of work:
Reconstruction of electrical equipment of power unit No. 5, DTEK Burshtyn TPP
Industry:
Thermal power
Location:
Ivano-Frankivsk region, Ukraine
Project timeline:
2013-2015
RECONSTRUCTION OF THE 330 KV ADZHALYK – USATOVE OHL

RECONSTRUCTION OF THE 330 KV ADZHALYK – USATOVE OHL

Client:
SE NPC “Ukrenergo”
Scope of work:
Reconstruction of the double-circuit section of the 330 kV Adzhalyk 2 – Usatove / Moldavska TPP – Usatove OHL
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2011-2013
110 KV OHL OF THE “SONIACHNA – ARTSYZ” SOLAR POWER PLANT, 110 KV “SONIACHNA – ARTSYZ” SUBSTATION

110 KV OHL OF THE “SONIACHNA – ARTSYZ” SOLAR POWER PLANT, 110 KV “SONIACHNA – ARTSYZ” SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Construction, installation and commissioning of the 110 kV Soniachna–Artsyz grid connection substation
Industry:
Alternative energy
Location:
Odesa region, Ukraine
Project timeline:
2011-2012
110 KV OHL OF THE “SONIACHNA – KILIIA” SOLAR POWER PLANT, 110 KV “SONIACHNA – KILIIA” SUBSTATION

110 KV OHL OF THE “SONIACHNA – KILIIA” SOLAR POWER PLANT, 110 KV “SONIACHNA – KILIIA” SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Construction, installation and commissioning of the 110 kV Soniachna–Kiliia OHL and grid connection substation
Industry:
Alternative energy
Location:
Odesa region, Ukraine
Project timeline:
2011-2014
RECONSTRUCTION OF THE 330 KV USATOVE SUBSTATION

RECONSTRUCTION OF THE 330 KV USATOVE SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Construction, installation and commissioning works and equipment supply at the 330 kV Usatove substation
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2011-2012
RECONSTRUCTION OF THE 220 KV TSENTROLIT – KOMINTERNOVE OHL

RECONSTRUCTION OF THE 220 KV TSENTROLIT – KOMINTERNOVE OHL

Client:
SE NPC “Ukrenergo”
Scope of work:
Reconstruction of the 220 kV OHL, towers No. 1–99
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2013-2013
RECONSTRUCTION OF THE 220 KV TSENTROLIT SUBSTATION

RECONSTRUCTION OF THE 220 KV TSENTROLIT SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Replacement of two VMT-110 oil circuit breakers on the “Bilshovyk” and “Luzanivka” bays with SF6 breakers and replacement of TS-110 current transformers at the 220 kV Tsentrolit substation
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2012-2012
RECONSTRUCTION OF THE 330 KV KRYVYI RIH TPP – TRYHATY OHL

RECONSTRUCTION OF THE 330 KV KRYVYI RIH TPP – TRYHATY OHL

Client:
SE NPC “Ukrenergo”
Scope of work:
Reconstruction of spans No. 74–150 and 160–172 with replacement of reinforced concrete towers by steel towers
Industry:
Power engineering
Location:
Dnipropetrovsk and Mykolaiv regions, Ukraine
Project timeline:
2012-2012
RECONSTRUCTION OF THE 330 KV MOLDAVSKA TPP – KOTOVSKA OHL

RECONSTRUCTION OF THE 330 KV MOLDAVSKA TPP – KOTOVSKA OHL

Client:
SE NPC “Ukrenergo”
Scope of work:
Reduction of the anchor span between towers No. 382 and 435
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2012-2012
RECONSTRUCTION OF POWER UNIT NO. 7 OF BURSHTYN TPP

RECONSTRUCTION OF POWER UNIT NO. 7 OF BURSHTYN TPP

Client:
OJSC “Zakhidenergo”
Scope of work:
Reconstruction and technical re-equipment of power unit No. 7
Industry:
Thermal power
Location:
Ivano-Frankivsk region, Ukraine
Project timeline:
2011-2011
RECONSTRUCTION OF THE 110 KV USATOVE – TSENTROLIT OHL

RECONSTRUCTION OF THE 110 KV USATOVE – TSENTROLIT OHL

Client:
OJSC “Odesaoblenergo”
Scope of work:
Reconstruction of the 110 kV Kirovska – Bilshovyk, Usatove – Kirovska and Usatove – Tsentrolit OHLs
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2010-2011
REPLACEMENT OF CIRCUIT BREAKERS AT THE 330 KV TRYHATY SUBSTATION

REPLACEMENT OF CIRCUIT BREAKERS AT THE 330 KV TRYHATY SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Replacement of four 330 kV air-blast circuit breakers with SF6 circuit breakers
Industry:
Power engineering
Location:
Mykolaiv region, Ukraine
Project timeline:
2010-2011
RECONSTRUCTION OF SECTIONS 1–3 OF THE 110 KV SWITCHGEAR AT THE 330 KV USATOVE SUBSTATION

RECONSTRUCTION OF SECTIONS 1–3 OF THE 110 KV SWITCHGEAR AT THE 330 KV USATOVE SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Reconstruction of the 330 kV Usatove substation including sections 1–3 of the 110 kV outdoor switchgear
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2011-2011
RECONSTRUCTION OF THE 110 KV USATOVE – CHUMKA, ODESA CHP – CHUMKA OHL

RECONSTRUCTION OF THE 110 KV USATOVE – CHUMKA, ODESA CHP – CHUMKA OHL

Client:
OJSC “Odesaoblenergo”
Scope of work:
Construction, installation and commissioning works and equipment supply
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2009-2010
DISMANTLING OF THE 330 KV ADZHALYK – USATOVE OHL SECTION

DISMANTLING OF THE 330 KV ADZHALYK – USATOVE OHL SECTION

Client:
SE NPC “Ukrenergo”
Scope of work:
Dismantling of the 330 kV Usatove – Moldavska TPP OHL section between towers No. 248 and 238
Industry:
Power engineering
Location:
Odesa region, Ukraine
Project timeline:
2012-2013
OVERHAUL OF THE 400 KV MOLDAVSKA TPP – VULCĂNEȘTI OHL

OVERHAUL OF THE 400 KV MOLDAVSKA TPP – VULCĂNEȘTI OHL

Client:
CJSC “Moldavskaya GRES” (Inter RAO UES)
Scope of work:
Overhaul of the 400 kV Moldavska TPP – Vulcănești OHL
Industry:
Power engineering
Location:
Moldova
Project timeline:
2010-2011
RECONSTRUCTION OF THE 220/35/10 KV “BEREZAN” SUBSTATION

RECONSTRUCTION OF THE 220/35/10 KV “BEREZAN” SUBSTATION

Client:
SE NPC “Ukrenergo”
Scope of work:
Reconstruction of the 220/35/10 kV substation
Industry:
Power engineering
Location:
Mykolaiv region, Ukraine
Project timeline:
2017-2018
Soyuz Corporation

5 MW BIOMASS POWER PLANT IN PEREIASLAV

Client:
Yugenergopromtrans Energy and Industrial Group LLC
Scope of work:
Construction of a biomass power plant
Industry:
Thermal power
Location:
Kyiv region, Ukraine
Project timeline:
2018-2018
BIOFUEL (WOOD WASTE) THERMAL POWER PLANT, 4,000 KVA

BIOFUEL (WOOD WASTE) THERMAL POWER PLANT, 4,000 KVA

Client:
Clear Energy LLC
Scope of work:
Construction of a biofuel thermal power plant
Industry:
Thermal power
Location:
Chernihiv region, Ukraine
Project timeline:
2016-2016